Civil Engineering Practice • Water Resources & Environmental
Biological Treatment, Softening & Disinfection
6 min read
- Lime softening removes carbonate hardness; soda ash is added for noncarbonate hardness.
- Disinfection is credited by CT: residual concentration (mg/L) × contact time (min).
Worked: an aeration basin
A 4 MGD plant sends primary effluent at 180 mg/L BOD to a 1.2 MG aeration basin holding 2,500 mg/L MLVSS. The BOD load is lb/day. per day, within the conventional range. day = 7.2 hours.
Check it stuck: a set from Water Resources and Environmental Engineering, the knowledge area this unit teaches.
Quiz this area0 of 39 units read in this chapter