0 of 39 units read in Civil Engineering Practice

Civil Engineering Practice • Water Resources & Environmental

Open Channels, Pipes & Pumps

7 min read


Worked: a sewer and a pump

  • 24 in concrete pipe, n=0.013n = 0.013, slope 0.5%, flowing full: R=0.5R = 0.5 ft, V=114.3×0.630×0.0707=5.09V = 114.3 \times 0.630 \times 0.0707 = 5.09 ft/s, Q=5.09×3.14=16.0Q = 5.09 \times 3.14 = 16.0 cfs.
  • A pump lifting 2 cfs through 80 ft of head at 75% efficiency: 62.4×2×80/0.75=13,30062.4 \times 2 \times 80/0.75 = 13{,}300 ft-lb/s = 24.2 hp.

Check it stuck: a set from Water Resources and Environmental Engineering, the knowledge area this unit teaches.

Quiz this area

0 of 39 units read in this chapter