0 of 39 units read in Civil Engineering Practice

Civil Engineering Practice • Water Resources & Environmental

Detention, Routing & Outlet Structures

6 min read


Worked: a subdivision pond

After development the design storm produces a triangular inflow hydrograph peaking at 60 cfs with a 90 minute base. The ordinance caps release at the pre-development peak, 25 cfs. Vs≈12×5,400 s×(60−25)=94,500V_{\text{s}} \approx \tfrac{1}{2} \times 5{,}400\ \text{s} \times (60 - 25) = 94{,}500 ft³ = 2.17 acre-ft.

A 4 ft weir passes 25 cfs at H=(253.33×4)2/3=1.52H = \left(\dfrac{25}{3.33 \times 4}\right)^{2/3} = 1.52 ft, which sets the top of the pond above the crest.

Check it stuck: a set from Water Resources and Environmental Engineering, the knowledge area this unit teaches.

Quiz this area

0 of 39 units read in this chapter