0/390 of 39 units read in Civil Engineering Practice
Civil Engineering Practice • Water Resources & Environmental
Detention, Routing & Outlet Structures
6 min read
Worked: a subdivision pond
After development the design storm produces a triangular inflow hydrograph peaking at 60 cfs with a 90 minute base. The ordinance caps release at the pre-development peak, 25 cfs. Vs≈21×5,400s×(60−25)=94,500 ft³ = 2.17 acre-ft.
A 4 ft weir passes 25 cfs at H=(3.33×425)2/3=1.52 ft, which sets the top of the pond above the crest.
Check it stuck: a set from Water Resources and Environmental Engineering, the knowledge area this unit teaches.