0 of 39 units read in Civil Engineering Practice

Civil Engineering Practice • Construction Engineering

Site Safety & Excavations

5 min read


  • Federal excavation rules (OSHA, 29 CFR 1926 Subpart P) require a protective system — sloping, benching, shoring or a shield — in trenches 5 ft deep or more unless they are in stable rock.
  • Maximum allowable slopes for excavations under 20 ft: Type A soil ¾H:1V, Type B 1H:1V, Type C 1½H:1V.
  • A trench 4 ft or deeper needs a ladder or other exit within 25 ft of lateral travel; spoil stays at least 2 ft back from the edge.
  • Temporary erosion control — silt fence, inlet protection, sediment basins — is part of the site plan, not an afterthought.

Worked

  • A 12 ft deep trench with a 4 ft bottom in Type B soil, sloped 1:1 both sides: top width = 4 + 2 × 12 = 28 ft.
  • Three recordable injuries in 420,000 hours worked: 3 × 200,000/420,000 = 1.43.

Check it stuck: a set from Construction Engineering, the knowledge area this unit teaches.

Quiz this area

0 of 39 units read in this chapter