Civil Engineering Practice • Construction Engineering
Estimating & Productivity
6 min read
Worked
- 10,000 BCY at 25% swell is 12,500 LCY; with 15 LCY trucks that is 834 loads.
- A loader with a 4 LCY bucket on a 0.6 minute cycle, working 50 minutes an hour: 4 × 50/0.6 = 333 LCY/h.
Check it stuck: a set from Construction Engineering, the knowledge area this unit teaches.
Quiz this area0 of 39 units read in this chapter