0/390 of 39 units read in Civil Engineering Practice
Civil Engineering Practice • Surveying
Coordinates, Inverses & State Plane
6 min read
Worked: inverse between two control points
A: N 5,000.00, E 3,000.00. B: N 5,412.30, E 2,756.10. ΔN=+412.30, ΔE=−243.90. L=412.302+243.902=479.04 ft. arctan(243.90/412.30)=30∘36′, and north with west puts it in the NW quadrant: N 30°36′ W, azimuth 329°24′.
The site is at 1,200 ft with a grid scale factor of 0.99996. Elevation factor =20,906,000/20,907,200=0.999943; combined factor 0.999903. The grid distance is 479.04×0.999903=478.99 ft.
Check it stuck: a set from Surveying, the knowledge area this unit teaches.