0/390 of 39 units read in Civil Engineering Practice
Civil Engineering Practice • Surveying
Angles, Bearings & Distances
5 min read
Worked: a total station shot
A total station reads a slope distance of 425.60 ft at a zenith angle of 86°30′. The vertical angle is 90∘−86∘30′=3∘30′. H=425.60×cos3.5∘=424.81 ft, and the target is 425.60×sin3.5∘=25.98 ft above the instrument’s line of sight.
Check it stuck: a set from Surveying, the knowledge area this unit teaches.