0 of 39 units read in Civil Engineering Practice

Civil Engineering Practice • Geotechnical Engineering

Seepage, Flow Nets & Quick Conditions

6 min read


Worked: under a sheet pile cofferdam

A flow net drawn for a cofferdam has 4 flow channels and 12 drops, with 20 ft of head difference and k=2×10−4k = 2 \times 10^{-4} ft/s. q=2×10−4×20×4/12=1.33×10−3q = 2 \times 10^{-4} \times 20 \times 4/12 = 1.33 \times 10^{-3} ft³/s per ft. Along a 100 ft wall that is 11,520 ft³ a day to pump.

The last square at the excavation floor is 2.5 ft long, and it loses 20/12=1.6720/12 = 1.67 ft: iexit=0.67i_{\text{exit}} = 0.67. With γsat=124.8\gamma_{\text{sat}} = 124.8 pcf, ic=62.4/62.4=1.0i_c = 62.4/62.4 = 1.0, and FS=1.0/0.67=1.5\mathrm{FS} = 1.0/0.67 = 1.5.

Check it stuck: a set from Geotechnical Engineering, the knowledge area this unit teaches.

Quiz this area

0 of 39 units read in this chapter