0/390 of 39 units read in Civil Engineering Practice
Civil Engineering Practice • Geotechnical Engineering
Seepage, Flow Nets & Quick Conditions
6 min read
Worked: under a sheet pile cofferdam
A flow net drawn for a cofferdam has 4 flow channels and 12 drops, with 20 ft of head difference and k=2×10−4 ft/s. q=2×10−4×20×4/12=1.33×10−3 ft³/s per ft. Along a 100 ft wall that is 11,520 ft³ a day to pump.
The last square at the excavation floor is 2.5 ft long, and it loses 20/12=1.67 ft: iexit=0.67. With γsat=124.8 pcf, ic=62.4/62.4=1.0, and FS=1.0/0.67=1.5.
Check it stuck: a set from Geotechnical Engineering, the knowledge area this unit teaches.