Geotechnical Engineering
Effective Stress
Total stress minus pore water pressure: the stress carried by the soil skeleton.
Effective stress is the part of the load carried grain to grain. Strength and compressibility both depend on it, not on total stress, which is why raising the water table weakens a slope even though nothing was added to it.
Total stress sums unit weight times thickness down the profile, using saturated unit weight below the water table; pore pressure is the unit weight of water times the depth below the water table.
How much of the FE Civil exam is Geotechnical Engineering?
