Level rod readings taken on a point of known elevation (backsight) and on a point to be found (foresight).


In differential leveling, a backsight is a rod reading on a point whose elevation is known; adding it to that elevation gives the height of instrument. A foresight is a reading on the next point; subtracting it from the height of instrument gives that point’s elevation.

Over a whole run, the final elevation equals the starting elevation plus the sum of backsights minus the sum of foresights, which is a quick arithmetic check. Keeping backsight and foresight distances about equal cancels curvature, refraction and any tilt of the line of sight.

How much of the FE Civil exam is Surveying?

Worked example

A level is set up between benchmark BM-7 (elevation 512.36 ft) and a turning point TP1. The rod reads 4.82 ft on the benchmark and 6.15 ft on TP1. The level is moved, reads 3.27 ft back on TP1 and 2.94 ft on point B. What is the elevation of B?

StationBS (ft)HI (ft)FS (ft)Elevation (ft)
BM-74.82517.18512.36
TP13.27514.306.15511.03
B2.94511.36

A backsight is added to a known elevation to get the height of instrument; a foresight is subtracted from it. Point B is at 511.36 ft.